Clear the way for the detail.
An initial clean of agreed areas once major works have finished and the site is ready for cleaning. Focus on construction dust, accessible surfaces and floors, with residue removal assessed against the finish.

End-of-construction & builders’ cleans
End-of-construction cleaning for large commercial projects, fit-outs and phased handovers. From the builders’ clean to final presentation, we plan the work around your site and handover programme.
Built around the programme
A finished building still needs careful preparation before people move in. Dust, trade activity, different finishes and changing access all affect the clean.
We take on large-project cleaning briefs as well as individual fit-outs and refurbishments. The plan starts with your areas, programme and handover standard, then defines the cleaning stages, working windows and resources for the job.
For a staged release, share the floors, blocks or units and the dates each area needs to be ready. We can discuss a phased cleaning programme rather than treating the whole project as one visit.
Explore an illustrative handover plan ↗Offices, reception areas and shared facilities approaching occupation.
Multi-floor premises with different finishes, access routes and cleaning priorities.
Completed internal works that need detailed cleaning before spaces reopen.
Floors, blocks or units released in an agreed sequence.

Three stages to consider
Choose the stages your project needs. The number of visits and the tasks at each stage are set out in your quotation.
An initial clean of agreed areas once major works have finished and the site is ready for cleaning. Focus on construction dust, accessible surfaces and floors, with residue removal assessed against the finish.
A detailed presentation clean of the agreed interior: floors, doors, skirtings, fixtures, accessible glazing, kitchens and washrooms. Methods are matched to the surfaces and materials.
A separately agreed return visit after snagging, trade access or last-minute activity. Target affected areas and final presentation ahead of the handover inspection.
Define the finish
The final scope depends on the condition of the site, the finishes and safe access. Typical areas for your cleaning specification include:
Agreed accessible ledges, shelves, fixtures and horizontal surfaces, with attention to the dust left after construction work.
Vacuuming, mopping or suitable floor cleaning, including accessible edges, skirtings and corners within the scope.
Accessible internal glass, partitions, frames and sills. High-level or external glazing requires a separate access assessment.
Agreed cupboards, worktops, sinks and staff facilities, with the internal and external surfaces clearly specified.
Sanitaryware, basins, taps, mirrors, cubicles and agreed wall and floor surfaces.
Doors, handles, entrances, stairs and circulation areas included in the handover brief.
Coordination matters
For larger projects, the sequence matters as much as the task list. We work through access, trade interfaces and the release of areas with your project contact before agreeing the service.
Our staff are vetted. Any additional site screening, induction or documentation requirements should be included in the project brief.
Bulk rubble removal, skip hire, hazardous materials, specialist remediation, work at height and construction snagging are not automatically included in a cleaning quotation.
Paint, plaster, adhesive, cement and protective-film residues need assessment before removal. The surface, product suitability and potential for damage determine the method and whether the task can be included.
Send photographs or a specification where available. Any separate requirements and exclusions are confirmed in the proposal.
Email your project briefGet a project quotation
Whether it is one completed fit-out or a larger phased programme, a clear brief helps us assess the work and prepare a relevant proposal.
Our commercial team reviews your information, clarifies the scope and discusses a site assessment where appropriate. The proposal confirms the cleaning stages, working arrangements and pricing.
Construction cleaning questions
Yes. We welcome large commercial project briefs and phased handover programmes, as well as individual fit-outs and refurbishments. Share the floor area, number of phases and deadlines so the scope, resources and availability can be assessed.
A phased programme can be discussed around the areas being released and the dates they need to be ready. Each phase, working window and return visit should be included in the agreed proposal.
No. An initial builders’ clean addresses the agreed areas after major works. A final clean focuses on detailed presentation. A later touch-up after snagging or further trade access is a separate stage to agree.
These tasks are assessed against the material, condition and safe removal method. They are not assumed to be included on every surface. Share photographs and product or finish information before the scope is confirmed.
Floor area, condition, surface types, access, cleaning stages, working windows and return visits all affect the work. A project-specific quotation sets out the agreed service and price.
From completed works to a cleaner handover
Share your project requirements early so the clean can be planned around the finish, the access and the handover date.